Imperial Pools/Evans Construction
Tags / Categories / Themes
Facebook Activity
20.12.2021
Sacramento day 1- Remove appliances, demo baseboard and laminate, prep floor with membrane. Ready for tile.
14.12.2021
Day 2 Livermore. Pour concrete collar, run plumbing and coping, and backfill outside of pool
13.12.2021
Day 1 Fairfield- Pool dug and steel set
11.12.2021
Day 3 Livermore. Pour concrete bottom, set liner, fill pool, and set forms for concrete deck
06.12.2021
Day 4 water compact, gravel, grade, rebar. Ready for concrete deck